DocumentCode
3533250
Title
Overview of CSIRO oceanographic moorings
Author
Lynch, Tim ; McLaughlin, Dan ; Hughes, Dave ; Darby, Ian ; De Boer, Phil ; Marouchos, Andreas
Author_Institution
Castray Esplanade, CSIRO, Hobart, TAS, Australia
fYear
2010
fDate
20-23 Sept. 2010
Firstpage
1
Lastpage
9
Abstract
The CSIRO section that produces oceanographic moorings has undergone considerable growth in recent years. Moorings are designed, built and deployed by Ocean Sensor Deployment (OSD), which is composed of three teams, Deepwater, Coastal and Western Australia. Team members and facilities are located in Hobart in Tasmania, Perth in Western Australia and Brisbane in Queensland. The workload of OSD has increased dramatically and is set to more than double over the next three years. Growth is mostly being driven by funding from the Australian Integrated Marine Observing System (IMOS), which has also changed the way that OSD operates. Moorings are now often developed as on-going systems to collected time series data as opposed to sequential process studies. As the system grows this has a cumulative effect on the resources required for servicing the mooring arrays.
Keywords
oceanographic equipment; time series; Australian Integrated Marine Observing System; Brisbane; CSIRO oceanographic moorings; Coastal Australia; Hobart; Ocean Sensor Deployment; Perth; Queensland; Tasmania; Western Australia; mooring arrays; time series data; Antarctica; Australia; Compass; Oceans; Sea measurements; Time series analysis;
fLanguage
English
Publisher
ieee
Conference_Titel
OCEANS 2010
Conference_Location
Seattle, WA
Print_ISBN
978-1-4244-4332-1
Type
conf
DOI
10.1109/OCEANS.2010.5664396
Filename
5664396
Link To Document