Title :
Reliability program for a financial computer-operations center
Author :
Ralston, Alexander H., Jr.
Author_Institution :
Kling-Lindquist Partnership Inc., Philadelphia, PA, USA
Abstract :
A reliability program was conducted for the various electrical, HVAC, and mechanical services in support of the development of a new major computer operations center for Shearson Lehman Hutton. The program included: detailed risk analysis involving the architect, the design engineers, the construction managers, specialty consultants, and Shearson´s engineering and computer user groups; correction of potential faults in design, construction, and operating procedures; factory and construction testing; preparation of special operating manuals; and annual reliability audits. A case history demonstrates reliable operation over a period of 1-1/2 years with no computer downtime
Keywords :
DP industry; DP management; financial data processing; reliability; HVAC; Shearson Lehman Hutton; annual reliability audits; construction procedure faults; construction testing; design engineering; electrical services; factory testing; financial computer-operations center; mechanical services; operating manuals; operating procedures; reliability program; risk analysis; Costs; Design engineering; Engineering management; Maintenance; Power system analysis computing; Power system reliability; Reliability engineering; Risk analysis; System testing; Uninterruptible power systems;
Conference_Titel :
Reliability and Maintainability Symposium, 1989. Proceedings., Annual
Conference_Location :
Atlanta, GA
DOI :
10.1109/ARMS.1989.49628