DocumentCode
3536788
Title
Effective algorithms for scheduling problems under non-availability constraints (Invited paper)
Author
Kacem, Imed
Author_Institution
LCOMS, Univ. de Lorraine, Metz, France
fYear
2013
fDate
26-27 Aug. 2013
Firstpage
162
Lastpage
169
Abstract
In this paper, we consider some practical scheduling problems under unavailability constraints (break-down periods, maintenance durations and/or setup times). Such problems can be met in different industrial environments and be associated to numerous real-life applications. The studied criteria are related to the maximum lateness minimization. The paper is organized in two main parts. The first part focuses on some special cases (makespan minimization when tails are equal and maximum lateness minimization when release dates are equal (see Section 2). The second part is devoted to the maximum lateness minimization (see Section 3). In each part, we present the main contributions and explain their principles (complexity results, heuristic algorithms and their worst-case performance, existing approximation schemes, exact methods, dynamic programming,...), Finally, Section 4 concludes the paper.
Keywords
constraint handling; dynamic programming; heuristic programming; minimisation; scheduling; dynamic programming; exact methods; heuristic algorithms; makespan minimization; maximum lateness minimization; nonavailability constraints; real life applications; scheduling problems; unavailability constraints; Algorithm design and analysis; Approximation algorithms; Approximation methods; Dynamic programming; Heuristic algorithms; Minimization; Schedules;
fLanguage
English
Publisher
ieee
Conference_Titel
Systems and Computer Science (ICSCS), 2013 2nd International Conference on
Conference_Location
Villeneuve d´Ascq
Print_ISBN
978-1-4799-2020-4
Type
conf
DOI
10.1109/IcConSCS.2013.6632041
Filename
6632041
Link To Document