• DocumentCode
    3536788
  • Title

    Effective algorithms for scheduling problems under non-availability constraints (Invited paper)

  • Author

    Kacem, Imed

  • Author_Institution
    LCOMS, Univ. de Lorraine, Metz, France
  • fYear
    2013
  • fDate
    26-27 Aug. 2013
  • Firstpage
    162
  • Lastpage
    169
  • Abstract
    In this paper, we consider some practical scheduling problems under unavailability constraints (break-down periods, maintenance durations and/or setup times). Such problems can be met in different industrial environments and be associated to numerous real-life applications. The studied criteria are related to the maximum lateness minimization. The paper is organized in two main parts. The first part focuses on some special cases (makespan minimization when tails are equal and maximum lateness minimization when release dates are equal (see Section 2). The second part is devoted to the maximum lateness minimization (see Section 3). In each part, we present the main contributions and explain their principles (complexity results, heuristic algorithms and their worst-case performance, existing approximation schemes, exact methods, dynamic programming,...), Finally, Section 4 concludes the paper.
  • Keywords
    constraint handling; dynamic programming; heuristic programming; minimisation; scheduling; dynamic programming; exact methods; heuristic algorithms; makespan minimization; maximum lateness minimization; nonavailability constraints; real life applications; scheduling problems; unavailability constraints; Algorithm design and analysis; Approximation algorithms; Approximation methods; Dynamic programming; Heuristic algorithms; Minimization; Schedules;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    Systems and Computer Science (ICSCS), 2013 2nd International Conference on
  • Conference_Location
    Villeneuve d´Ascq
  • Print_ISBN
    978-1-4799-2020-4
  • Type

    conf

  • DOI
    10.1109/IcConSCS.2013.6632041
  • Filename
    6632041