• DocumentCode
    3538867
  • Title

    Study and Application of Business Process Optimization and Evaluation

  • Author

    Dewei Peng ; Liang Cheng ; Hongmei Zhou ; Xia Zhang

  • Author_Institution
    Dept. of Comput., Wuhan Univ. of Technol., Wuhan, China
  • fYear
    2012
  • fDate
    6-8 Dec. 2012
  • Firstpage
    380
  • Lastpage
    383
  • Abstract
    For the lack of evaluation before the implementation process of business process optimization, this paper presents doing evaluations before the implementation of business processes optimization. The paper uses the method of multiplying and maximizing that combines matrix with fuzzy calculation to improve existing fuzzy comprehensive evaluation method and solves the problem that evaluation result cannot effectively reflect the changes of weight. Then the method is applied to the equipment management process optimization of Second Harbor Engineering Company and the evaluation result reflects the changes of weight more effectively than the original fuzzy comprehensive evaluation.
  • Keywords
    business process re-engineering; construction equipment; construction industry; fuzzy set theory; matrix algebra; Second Harbor Engineering Company; business process evaluation; business process optimization; equipment management process optimization; fuzzy calculation; fuzzy comprehensive evaluation method; matrix; maximizing method; multiplying method; Algorithm design and analysis; Companies; Educational institutions; Indexes; Optimization methods; fuzzy evaluation; fuzzy matrix; process improvement;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    Services Computing Conference (APSCC), 2012 IEEE Asia-Pacific
  • Conference_Location
    Guilin
  • Print_ISBN
    978-1-4673-4825-6
  • Type

    conf

  • DOI
    10.1109/APSCC.2012.39
  • Filename
    6478248