• DocumentCode
    3539807
  • Title

    Multi-site planning: non flexible production units and set-up time treatment

  • Author

    Thierry, Caroline ; Besnard, Pascal ; Ghattas, Dimitri ; Bel, Gérard

  • Author_Institution
    Dept. d´´Etudes et de Recherches en Autom., Centre d´´Etudes et de Recherches de Toulouse, France
  • Volume
    3
  • fYear
    1995
  • fDate
    10-13 Oct 1995
  • Firstpage
    261
  • Abstract
    In this paper the multi-site planning and control problem is considered. This problem consists in improving coordination of different production units in the field of production planning and control for a multi-site production. A multi-site production takes place when the production facilities of an international company are located in different geographical sites. To solve this problem a centralised approach has been chosen and a multi-site planning integrated system has been built in relation with the local planning and control systems of the different production sites. This centralised approach is first introduced: the chosen constraint satisfaction method (used in the field of constraint satisfaction problems) is presented as well as the results concerning a given industrial application. Moreover in such a multi-site production some production units are characterised by large set-up time between two different production orders treatments. Thus, a model and a solving method compatible with the previous multi-site planning and control system are proposed for those production units. This model has been thought to be generic in order to be very easily adapted to different kind of multi-site productions. So several strategies are proposed and their efficiency is compared according to different criteria concerning the structure of the company; and the production orders
  • Keywords
    centralised control; computer aided production planning; constraint theory; goods distribution; manufacturing resources planning; production control; centralised approach; constraint satisfaction method; international company; multi-site planning; multi-site production; nonflexible production units; production facilities; set-up time treatment; Automatic control; Centralized control; Control system synthesis; Control systems; Electrical equipment industry; Industrial relations; Production facilities; Production planning; Production systems; Transportation;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    Emerging Technologies and Factory Automation, 1995. ETFA '95, Proceedings., 1995 INRIA/IEEE Symposium on
  • Conference_Location
    Paris
  • Print_ISBN
    0-7803-2535-4
  • Type

    conf

  • DOI
    10.1109/ETFA.1995.496726
  • Filename
    496726