• DocumentCode
    3558873
  • Title

    Impact of Unit Failure on Forward Contracting

  • Author

    Pineda, Salvador ; Conejo, Antonio J. ; Carri?³n, Miguel

  • Author_Institution
    Univ. de Castilla-La Mancha, Ciudad Real
  • Volume
    23
  • Issue
    4
  • fYear
    2008
  • Firstpage
    1768
  • Lastpage
    1775
  • Abstract
    A generating unit can sell its production in the pool facing the financial risk inherent to volatile pool prices. Alternatively, it can sell its production through the futures market at comparatively stable but smaller average prices. Unlike the pool, forward contracts involve an obligation to sell during a specified time period, and, if the unit fails, it should buy energy from the pool to meet its futures market commitments. Hence, taking into account its forced outage rate, the unit should determine the appropriate mix of pool and futures-market involvement so that its expected profit is maximized for a prespecified risk level on profit variability. Within this context, this paper analyzes the impact of the degree of unavailability of the generating unit on its forward contracting decisions. A detailed case study illustrates the analysis performed.
  • Keywords
    contracts; power generation economics; power markets; pricing; risk analysis; forward contracting; generating unit; pool prices; power pools; risk level; unit failure impact; Costs; Forward contracts; Performance analysis; Production; Programming profession; Random variables; Stochastic processes; Forced outage rate (FOR); futures market; pool; power producer; risk; stochastic programming;
  • fLanguage
    English
  • Journal_Title
    Power Systems, IEEE Transactions on
  • Publisher
    ieee
  • ISSN
    0885-8950
  • Type

    jour

  • DOI
    10.1109/TPWRS.2008.2004727
  • Filename
    4652576