• DocumentCode
    3570721
  • Title

    PMU Based System Protection Scheme

  • Author

    Rahmatian, Matin ; Dunford, William G. ; Moshref, Ali

  • Author_Institution
    Dept. of Electr. & Comput. Eng., Univ. of British Columbia, Vancouver, BC, Canada
  • fYear
    2014
  • Firstpage
    35
  • Lastpage
    40
  • Abstract
    Phasor Measurement Units (PMUs) are being widely installed in modern power systems worldwide. The most important advantage of PMUs is their capability to provide fast, reliable and synchronized real-time measurements of different system parameters. This characteristic leads to an essential role of PMUs in real-time monitoring, advanced power system protection, and advanced control schemes. In this paper, a new scheme for controlled separation of two real power systems, i.e., British Columbia and Alberta power systems, based on PMUs synchronized measurements of angles is proposed. Two indices, based on region center of angle and kinetic energy function are obtained for the two power systems. The results demonstrate the reliability, speed and efficiency of the proposed scheme in comparison to the existing installed scheme.
  • Keywords
    phasor measurement; power system protection; Alberta power systems; British Columbia power systems; PMU based system protection scheme; advanced control schemes; advanced power system protection; kinetic energy function; phasor measurement units; real-time monitoring; reliability; synchronized real-time measurements; Current measurement; Indexes; Islanding; Phasor measurement units; Power system stability; Real-time systems; Controlled Islanding; Phasor Measurement Unit (PMU); Special Protection Scheme (SPS); Wide Area Measurement System (WAMS);
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    Electrical Power and Energy Conference (EPEC), 2014 IEEE
  • Type

    conf

  • DOI
    10.1109/EPEC.2014.47
  • Filename
    7051671