• DocumentCode
    3571198
  • Title

    Comparison of CONDOR, FCI and MAFIA calculations for a 150 MW S-band klystron with measurements

  • Author

    Becker, U. ; Weiland, T. ; Dohlus, M. ; L?¼tgert, S. ; Sprehn, D.

  • Author_Institution
    Tech. Hochschule Darmstadt, Germany
  • Volume
    4
  • fYear
    1995
  • Firstpage
    2190
  • Abstract
    To facilitate the design of high power klystrons an investigation into the reliability and accuracy of three modern particle-in-cell codes was performed. A 150 MW S-band klystron for which measurements were available was used for this comparison. The field calculations of the particle-in-cell codes are based on a finite difference time domain scheme, and use a port approximation to speed up the convergence to steady state. However they differ in many details (e.g. calculation of E, B or A, φ; space charge correction; 2D or 3D modelling of the output cavity)
  • Keywords
    finite difference time-domain analysis; klystrons; power engineering computing; power supplies to apparatus; 150 MW; CONDOR; FCI; MAFIA; S-band klystron; convergence; finite difference time domain scheme; high power klystrons; particle-in-cell codes; space charge correction; Circuit simulation; Computational modeling; Electromagnetic fields; Klystrons; Magnetic field measurement; Particle beams; Particle measurements; Power measurement; Space charge; Steady-state;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    Particle Accelerator Conference, 1995., Proceedings of the 1995
  • Print_ISBN
    0-7803-2934-1
  • Type

    conf

  • DOI
    10.1109/PAC.1995.505494
  • Filename
    505494