DocumentCode
3573099
Title
An Activity-List based Nested Partitions algorithm for Resource-Constrained Project Scheduling
Author
Lei Xiao ; Jing Tian ; Zhenyuan Liu
Author_Institution
Sch. of Autom., Huazhong Univ. of Sci. & Technol., Wuhan, China
fYear
2014
Firstpage
3450
Lastpage
3454
Abstract
In this paper, we propose an Activity-List based Nested Partitions algorithm for solving the Resource-Constrained Project Scheduling Problem(RCPSP). This algorithm is based on traditional Serial Scheduling scheme (SSS) and partitions the feasible solution space which is formulated by activity-lists into subregions by the nested partitions approach. We also utilize Double Justification as local search to improve the solutions. The algorithm is tested on J120 in PSPLIB with the result that the algorithm is relatively effective for solving large-scale, complex RCPSPs.
Keywords
minimisation; project management; scheduling; ALNP; PSPLIB; RCPSP; SSS; activity-list based nested partitions algorithm; double justification; local search; resource-constrained project scheduling; serial scheduling scheme; Algorithm design and analysis; Educational institutions; Heuristic algorithms; Job shop scheduling; Partitioning algorithms; Processor scheduling; Activity-List; Double Justification; Nested Partitions; Resource-Constrained Project Scheduling Problem; Serial Scheduling Schema;
fLanguage
English
Publisher
ieee
Conference_Titel
Intelligent Control and Automation (WCICA), 2014 11th World Congress on
Type
conf
DOI
10.1109/WCICA.2014.7053289
Filename
7053289
Link To Document