DocumentCode
3578511
Title
Feasibility exploration of off-site TT&C Compatibility Test
Author
Wenge Yang ; Jiang Zhao ; Yanhe Cheng
Author_Institution
Equip. Acad., Beijing, China
fYear
2014
Firstpage
562
Lastpage
565
Abstract
Through analyze the existing TT&C compatibility test, for the problem of long period and inefficiency, an off-site compatibility test method is proposed. This method installs the off-site compatibility test equipment in both ends of transponder and ground station which are apart. By building the system construction, the model of transmission link is drawn. In addition, based on the jitter of clock signal described in frequency, phase and time domain, the effect of jitter on signal coherence is deduced. It is shown that, the signal coherence won´t be affected when using time and frequency remote calibration and traceability technology and system clocks which have good performance of short term frequency stability. In other words, the off-site TT&C compatibility test is feasibly.
Keywords
aerospace testing; calibration; clocks; frequency stability; jitter; test equipment; clock signal coherence jitter; frequency domain analysis; frequency remote calibration; ground station; off-site TT&C compatibility test equipment; phase domain analysis; short term frequency stability; spacecraft testing; time domain analysis; time remote calibration; transmission link model; transponder; Clocks; Coherence; Frequency synchronization; Jitter; Time-frequency analysis; Transponders; TT&C; coherence; compatibility test; frequency stability; off-site; remote calibration; timing jitter;
fLanguage
English
Publisher
ieee
Conference_Titel
Communication Problem-Solving (ICCP), 2014 IEEE International Conference on
Print_ISBN
978-1-4799-4246-6
Type
conf
DOI
10.1109/ICCPS.2014.7062384
Filename
7062384
Link To Document