DocumentCode
3583397
Title
Tune feedback at RHIC
Author
Cameron, P. ; Cerniglia, P. ; Connolly, R. ; Cupolo, J. ; Dawson, W.C. ; Degen, C. ; DellaPenna, A. ; DeLong, J. ; Drees, A. ; Huhn, A. ; Kesselman, M. ; Marusic, A. ; Oerter, B. ; Mead, J. ; Schultheiss, C. ; Sikora, R. ; van Zeijts, J.
Author_Institution
Brookhaven Nat. Lab., Upton, NY, USA
Volume
2
fYear
2001
fDate
6/23/1905 12:00:00 AM
Firstpage
1294
Abstract
Preliminary phase-locked loop betatron tune measurement results were obtained during RHIC 2000 with a resonant Beam Position Monitor. These results suggested the possibility of incorporating PLL tune measurement into a tune feedback system for RHIC 2001. Tune feedback is useful in a superconducting accelerator, where the machine cycle time is long and inefficient acceleration due to resonance crossing is not comfortably tolerated. This is particularly true with the higher beam intensities planned for RHIC 2001. We present descriptions of a PLL tune measurement system implemented in the DSP/FPGA environment of a RHIC BPM electronics module and the feedback system into which the measurement is incorporated to regulate tune. In addition, we present results from the commissioning of this system during RHIC 2001
Keywords
accelerator control systems; colliding beam accelerators; feedback; ion accelerators; particle beam diagnostics; phase locked loops; storage rings; DSP/FPGA environment; PLL tune measurement; RHIC; machine cycle time; phase-locked loop betatron tune measurement; resonance crossing; resonant beam position monitor; superconducting accelerator; tune feedback system;
fLanguage
English
Publisher
ieee
Conference_Titel
Particle Accelerator Conference, 2001. PAC 2001. Proceedings of the 2001
Print_ISBN
0-7803-7191-7
Type
conf
DOI
10.1109/PAC.2001.986658
Filename
986658
Link To Document