• DocumentCode
    3589223
  • Title

    Performance monitoring and improvement on urban rail resignalling projects

  • Author

    Afonso, A. ; Grandmougin, T. ; Windham, W.

  • Author_Institution
    Thales Ground Transp. Syst., London, UK
  • fYear
    2014
  • Firstpage
    1
  • Lastpage
    6
  • Abstract
    During re-signalling of London Underground´s Northern Line innovative methods were developed to provide a step change reduction in the number of track closures and improvement in reliability monitoring and performance. The techniques and technologies developed are also applicable to in-service reliability improvement programmes.
  • Keywords
    railways; signalling; London underground northern line innovative methods; inservice reliability; performance improvement; performance monitoring; reliability monitoring; reliability performance; step change reduction; urban rail resignalling projects; SelTrac; Resignalling; In-Service; Reliability;Monitoring;
  • fLanguage
    English
  • Publisher
    iet
  • Conference_Titel
    Railway Condition Monitoring (RCM 2014), 6th IET Conference on
  • Print_ISBN
    978-1-84919-913-1
  • Type

    conf

  • Filename
    7104993