How to shorten the examining and testing time of the GIS equipment anti-mishandling system in substations
Author :
Dong, Jun ; Chen, Xin
Author_Institution :
Jiangsu Nanjing Power Supply Co., Nanjing, China
fYear :
2010
Firstpage :
1
Lastpage :
12
Abstract :
The importance and safety of the anti-mishandling system for the 220kV substations is of top-grade for the operators. But the examining and testing time always lasts several working days, which put a fairly heavy pressure on the operators in the existing state and will also influence the commissioning date of the newly set equipment. This paper discussed how to shorten the examining and testing time of the substations´ GIS equipment and enhance the efficiency of such work..
Keywords :
gas insulated substations; GIS equipment; anti-mishandling system; examining time; substations; testing time; voltage 220 kV; Connectors; Geographic Information Systems; Substations; Testing; Anti-mishandling system; Examining and testing time; Shortening; Substation;
fLanguage :
English
Publisher :
ieee
Conference_Titel :
Electricity Distribution (CICED), 2010 China International Conference on
Print_ISBN :
978-1-4577-0066-8
Type :
conf
Filename :
5735878
Link To Document :
بازگشت