DocumentCode
3592316
Title
How to shorten the examining and testing time of the GIS equipment anti-mishandling system in substations
Author
Dong, Jun ; Chen, Xin
Author_Institution
Jiangsu Nanjing Power Supply Co., Nanjing, China
fYear
2010
Firstpage
1
Lastpage
12
Abstract
The importance and safety of the anti-mishandling system for the 220kV substations is of top-grade for the operators. But the examining and testing time always lasts several working days, which put a fairly heavy pressure on the operators in the existing state and will also influence the commissioning date of the newly set equipment. This paper discussed how to shorten the examining and testing time of the substations´ GIS equipment and enhance the efficiency of such work..
Keywords
gas insulated substations; GIS equipment; anti-mishandling system; examining time; substations; testing time; voltage 220 kV; Connectors; Geographic Information Systems; Substations; Testing; Anti-mishandling system; Examining and testing time; Shortening; Substation;
fLanguage
English
Publisher
ieee
Conference_Titel
Electricity Distribution (CICED), 2010 China International Conference on
Print_ISBN
978-1-4577-0066-8
Type
conf
Filename
5735878
Link To Document