    How to shorten the examining and testing time of the GIS equipment anti-mishandling system in substations

  • Author

    Dong, Jun ; Chen, Xin

  • Author_Institution
    Jiangsu Nanjing Power Supply Co., Nanjing, China
  • fYear
    2010
  • Firstpage
    1
  • Lastpage
    12
  • Abstract
    The importance and safety of the anti-mishandling system for the 220kV substations is of top-grade for the operators. But the examining and testing time always lasts several working days, which put a fairly heavy pressure on the operators in the existing state and will also influence the commissioning date of the newly set equipment. This paper discussed how to shorten the examining and testing time of the substations´ GIS equipment and enhance the efficiency of such work..
  • Keywords
    gas insulated substations; GIS equipment; anti-mishandling system; examining time; substations; testing time; voltage 220 kV; Connectors; Geographic Information Systems; Substations; Testing; Anti-mishandling system; Examining and testing time; Shortening; Substation;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    Electricity Distribution (CICED), 2010 China International Conference on
  • Print_ISBN
    978-1-4577-0066-8
  • Type

    conf

  • Filename
    5735878