• DocumentCode
    3593515
  • Title

    Development of a Multilayer Hierarchical Scheduling Algorithm for Manufacturing Systems with Identical Machines

  • Author

    Lin, Jian-Nan ; Ying-Ping, Zheng

  • Author_Institution
    Institute of Automation, Academia Sinica, P. O. Box 2728, Beijing 100080, P. R. China.
  • fYear
    1989
  • Firstpage
    2400
  • Lastpage
    2404
  • Abstract
    This paper deals with the problem of scheduling dependent tasks with release time, deadline and due time on identical parallel machines. Based on decomposition-coordination methodology in large scale systems theory and Lagrangian relaxation technique, a multilayer hierarchical scheduling algorithm is presented. By making the most of structural properties of the precedence graph of partial ordering task set and introducing the concept of "feasible start time interval ", the proposed algorithm can be used for solving the scheduling problem under study effectively.
  • Keywords
    Availability; Job production systems; Job shop scheduling; Large-scale systems; Manufacturing systems; Nonhomogeneous media; Optimal scheduling; Parallel machines; Processor scheduling; Scheduling algorithm;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    American Control Conference, 1989
  • Type

    conf

  • Filename
    4790592