• DocumentCode
    3594423
  • Title

    Delivering a light rail system into service - considerations for effective asset management

  • Author

    Knott, Alan ; Hack, Matthew ; Cope, Adrian

  • Author_Institution
    Parsons Brinckerhoff Ltd., UK
  • fYear
    2014
  • Firstpage
    1
  • Lastpage
    6
  • Abstract
    Using experience gained from a number of rail and transit projects the authors discuss how the engineering practices used throughout the lifecycle of a large, modern infrastructure programme affect the delivery and transfer into service of infrastructure assets and describe one particular, pragmatic approach which has enabled Transport for Greater Manchester (TfGM) to successfully introduce a number of new services on what is now the UK´s largest tram network.
  • Keywords
    asset management; network theory (graphs); project management; railways; rapid transit systems; TfGM; Transport for Greater Manchester; UK largest tram network; effective asset management; engineering practices; light rail system; modern infrastructure programme; pragmatic approach; rail projects; transit projects;
  • fLanguage
    English
  • Publisher
    iet
  • Conference_Titel
    Asset Management Conference 2014
  • Print_ISBN
    978-1-84919-865-3
  • Type

    conf

  • DOI
    10.1049/cp.2014.1053
  • Filename
    7129248