DocumentCode :
3596541
Title :
EVs participation in energy and reserve market considering primary and tertiary frequency regulation constraints
Author :
Salahshour, Reza ; Mirmoradi, Ehsan ; Ghasemi, Hassan
Author_Institution :
Sch. of Electr. & Comput. Eng., Univ. of Tehran, Tehran, Iran
fYear :
2014
Firstpage :
1
Lastpage :
6
Abstract :
Frequency regulation after contingences is one of the main concerns of power system operators. Primary predefined reserve, which is deployed in order to maintain frequency deviations within allowed bands, can lead to an increase in operation cost of system, due to the need for committing more generation units. Participation of electrical vehicles in electricity market can be utilized as a means of reducing operation costs. A model to integrate EVs participation in energy and reserve market is presented. The model takes frequency regulation constraints into consideration. The results indicate that the system/market operators can utilize EVs to reduce operation cost while frequency constraints are respected.
Keywords :
electric vehicles; frequency control; power generation control; power generation economics; power markets; EV participation; electric vehicles; electricity market; energy market; frequency deviations; generation units; operation cost reduction; power system operators; primary frequency regulation constraint; reserve market; tertiary frequency regulation constraint; Batteries; Electricity supply industry; Frequency control; Mathematical model; Planning; Power generation; Power systems;
fLanguage :
English
Publisher :
ieee
Conference_Titel :
Smart Grid Conference (SGC), 2014
Print_ISBN :
978-1-4799-8313-1
Type :
conf
DOI :
10.1109/SGC.2014.7151034
Filename :
7151034
Link To Document :
بازگشت