DocumentCode
3604064
Title
Delay Minimization for Progressive Construction of Satellite Constellation Network
Author
Zhe Liu ; Wei Guo ; Weisheng Hu ; Ming Xia
Author_Institution
State Key Lab. of Adv. Opt. Commun. Syst. & Networks, Shanghai Jiao Tong Univ., Shanghai, China
Volume
19
Issue
10
fYear
2015
Firstpage
1718
Lastpage
1721
Abstract
During the construction of satellite constellation, communication relay service could be provided by a partially constructed constellation through buffering data and forwarding it at a later time. However, this will introduce extra end-to-end delay during the construction period. We propose a scheme to determine an optimal construction process, which is used to insert satellites into appropriate positions in each stage of construction. Simulation results show that our scheme can reduce the average end-to-end delay by 70.1% compared to the traditional scheme.
Keywords
delays; minimisation; relay networks (telecommunication); satellite communication; communication relay service; delay minimization; end-to-end delay; optimal construction process; satellite constellation network; Delays; Fuels; Orbits; Relays; Satellite broadcasting; Satellite constellations; Satellites; Progressive construction; end-to-end delay; progressive construction; satellite constellation network;
fLanguage
English
Journal_Title
Communications Letters, IEEE
Publisher
ieee
ISSN
1089-7798
Type
jour
DOI
10.1109/LCOMM.2015.2462358
Filename
7172458
Link To Document