DocumentCode
3637926
Title
Future improvements in the Romanian EPS Defence Plan
Author
F. Balaşiu;F. M. Lazăr;R. Balaurescu;F. E. Ciausiu;L. Toma;M. Eremia
Author_Institution
Transelectrica - Romania Power Grid Company, 16-18 Hristo Botev, Bucharest - 3 030236, Romania
fYear
2010
Firstpage
1
Lastpage
8
Abstract
The Defence Plan comprising the automatic measures foreseen to prevent the occurrence of major disturbances or to limit their consequences in the Romanian Electric Power System (EPS) is in a permanent evaluation process in order to include and develop new actions adapted to the changes of the network structure. These new measures are chosen in relation with the nature and intensity of the disturbance and their action, in conjunction with the existing measures, is to re-establish the EPS normal operation. The aspects related with the stability reserve of a power system before a blackout might occur are treated in this paper. Both online and offline simulations are presented like measures for future improvements in the Romanian EPS Defence Plan.
Keywords
"Power system stability","Stability analysis","Steady-state","Integrated circuit interconnections","Power system dynamics","Frequency measurement"
Publisher
ieee
Conference_Titel
Power and Energy Society General Meeting, 2010 IEEE
ISSN
1932-5517
Print_ISBN
978-1-4244-6549-1
Type
conf
DOI
10.1109/PES.2010.5588084
Filename
5588084
Link To Document