DocumentCode
3642028
Title
Development of control and monitoring system of UCG by Promotic
Author
Karol Kostúr;Ján Kacur
Author_Institution
Institute of Control and Informatization of Production Processes, Faculty BERG, Technical University of Koš
fYear
2011
fDate
5/1/2011 12:00:00 AM
Firstpage
215
Lastpage
219
Abstract
Monitoring and late control system for Underground Coal Gasification (UCG) in laboratory condition were developed. Architecture server & client were used. Hardware configuration consists from PC an PLC. Software package was created on base Automation Studio and Promotic. Data processing of measured variables including visualization (monitoring system) is realized in Promotic and DDC by a help PLC. The connection between Control and Monitoring system is realized with interfaces OPC and PVI. This solution appears as stable and one providing quick exchange of data between PLC and PC.
Keywords
"Coal","Monitoring","Control systems","Process control","Servers","Software","Data visualization"
Publisher
ieee
Conference_Titel
Carpathian Control Conference (ICCC), 2011 12th International
Print_ISBN
978-1-61284-360-5
Type
conf
DOI
10.1109/CarpathianCC.2011.5945850
Filename
5945850
Link To Document