DocumentCode :
3642028
Title :
Development of control and monitoring system of UCG by Promotic
Author :
Karol Kostúr;Ján Kacur
Author_Institution :
Institute of Control and Informatization of Production Processes, Faculty BERG, Technical University of Koš
fYear :
2011
fDate :
5/1/2011 12:00:00 AM
Firstpage :
215
Lastpage :
219
Abstract :
Monitoring and late control system for Underground Coal Gasification (UCG) in laboratory condition were developed. Architecture server & client were used. Hardware configuration consists from PC an PLC. Software package was created on base Automation Studio and Promotic. Data processing of measured variables including visualization (monitoring system) is realized in Promotic and DDC by a help PLC. The connection between Control and Monitoring system is realized with interfaces OPC and PVI. This solution appears as stable and one providing quick exchange of data between PLC and PC.
Keywords :
"Coal","Monitoring","Control systems","Process control","Servers","Software","Data visualization"
Publisher :
ieee
Conference_Titel :
Carpathian Control Conference (ICCC), 2011 12th International
Print_ISBN :
978-1-61284-360-5
Type :
conf
DOI :
10.1109/CarpathianCC.2011.5945850
Filename :
5945850
Link To Document :
بازگشت