DocumentCode
3649460
Title
The broadband multi-megawatt ECRH system at ASDEX upgrade
Author
D. Wagner;J. Stober;F. Honecker;F. Leuterer;F. Monaco;S. Müller;M. Münich;M. Reich;M. Schubert;H. Schütz;W. Treutterer;H. Zohm;M. Thumm;T. Scherer;A. Meier;G. Gantenbein;J. Jelonnek;W. Kasparek;B. Plaum;H. Höhnle;C. Lechte;A.G.
Author_Institution
Max-Planck-Institut fü
fYear
2012
Firstpage
1
Lastpage
2
Abstract
Seven gyrotrons are currently in operation in the ASDEX Upgrade Electron Cyclotron Resonance Heating (ECRH) system delivering a total of 3.9 MW to the plasma at 140 GHz. The 3 new gyrotrons are capable of 2-frequency operation and may heat the plasma alternatively with 2.1 MW at 105 GHz.
Keywords
"Plasmas","Gyrotrons","Heating","Real-time systems","Mirrors","Probes","Switches"
Publisher
ieee
Conference_Titel
Infrared, Millimeter, and Terahertz Waves (IRMMW-THz), 2012 37th International Conference on
ISSN
2162-2027
Print_ISBN
978-1-4673-1598-2
Electronic_ISBN
2162-2035
Type
conf
DOI
10.1109/IRMMW-THz.2012.6380128
Filename
6380128
Link To Document