• DocumentCode
    3658115
  • Title

    Q-mark model assessment using CBAM (cost benefit analysis method)

  • Author

    Jeong-Hyun Park; Jin-Sam Kim; Ki-Hong Kim; Boo-Hyung Lee; Chi-Young Park

  • Author_Institution
    Quality Assurance Research Section, SW Contents Lab., ETRI, Daejeon, Korea
  • fYear
    2015
  • Firstpage
    1805
  • Lastpage
    1808
  • Abstract
    This paper presents assessment of processes in Q-mark based on CBAM (cost benefit analysis method). There are 5 main processes with 3 additional processes in Q-mark for quality of R&D projects. Among 8 processes assessment results, test management process and project execution management process are high priority for quality of R&D projects, otherwise, peer review process and project tailoring process are low priority. The Q-mark model has been adapted and improved continuously for quality upgrade of R&D projects, and customer satisfaction of products.
  • Keywords
    "Certification","Adaptation models","Quality assurance","Requirements management","Configuration management","ISO Standards"
  • Publisher
    ieee
  • Conference_Titel
    Management of Engineering and Technology (PICMET), 2015 Portland International Conference on
  • Type

    conf

  • DOI
    10.1109/PICMET.2015.7273008
  • Filename
    7273008