• DocumentCode
    3663602
  • Title

    Heuristics with grouping of jobs for power-aware scheduling problems

  • Author

    Rafał Różycki;Arkadiusz Zimniak

  • Author_Institution
    Institute of Computing Science, Poznan University of Technology, Poznań
  • fYear
    2015
  • Firstpage
    47
  • Lastpage
    51
  • Abstract
    We consider a problem of scheduling independent preemptable jobs on parallel identical machines with the schedule length criterion. The processing rate of a job at a given moment depends on the temporal amount of power allocated to this job. Available power and energy are treated as a doubly-constrained resource, thus the problem is to find the schedule with the minimal length which respects the given limits of all resources. A known method for finding an optimal solution assumes that a particular non-linear mathematical programming problem is formulated and solved. Unfortunately, the number of variables in the problem grows exponentially with the size of an instance. Thus we propose heuristic approach for the considered problem. The heuristics utilizes the concept of grouping jobs with the same processing characteristics. The effectiveness of the algorithm with different settings is tested basing on a computational experiment.
  • Keywords
    "Schedules","Resource management","Processor scheduling","Mathematical programming","Computers","Optimal scheduling","Principal component analysis"
  • Publisher
    ieee
  • Conference_Titel
    Methods and Models in Automation and Robotics (MMAR), 2015 20th International Conference on
  • Type

    conf

  • DOI
    10.1109/MMAR.2015.7283704
  • Filename
    7283704