• DocumentCode
    3665232
  • Title

    Day-ahead dispatch of Battery Energy Storage System for peak load shaving and load leveling in low voltage unbalance distribution networks

  • Author

    Kalpesh A. Joshi;Naran M. Pindoriya

  • Author_Institution
    Electrical Engineering, IIT Gandhinagar, Ahmedabad, India
  • fYear
    2015
  • fDate
    7/1/2015 12:00:00 AM
  • Firstpage
    1
  • Lastpage
    5
  • Abstract
    Battery Energy Storage Systems (BESS) can be used for peak load shaving and load leveling apart from other potential applications in low voltage unbalance distribution networks. This paper proposes a simple approach for phase-wise day-ahead dispatch of BESS with the main objective of peak load shaving and secondary objective of load leveling. The first stage of the exercise identifies up to six Characteristic Daily Load Profiles (CDLPs) in each phase to represent the most frequently occurring patterns of load profiles. The CDLPs are then processed with a three-stage discharge-recharge allocation algorithm. The results obtained with phase-wise dispatch strategy show benefits of this approach in unbalance distribution networks in terms of better peak load shaving and load leveling. The work presented in this article is a part of an on-going work on real-time multi-objective dispatch of BESS in microgrid environment with distributed generators.
  • Keywords
    "Power demand","Silicon","Scheduling algorithms","Discharges (electric)","Batteries","Low voltage"
  • Publisher
    ieee
  • Conference_Titel
    Power & Energy Society General Meeting, 2015 IEEE
  • ISSN
    1932-5517
  • Type

    conf

  • DOI
    10.1109/PESGM.2015.7285673
  • Filename
    7285673