Development of a life cycle cost estimating tool to compare GIS and AIS substation projects
Author
Tik Son Wong;Jose Lopez-Roldan;Tapan Saha
fYear
2015
fDate
7/1/2015 12:00:00 AM
Firstpage
1
Lastpage
5
Abstract
Gas-insulated switchgears (GIS) are emerging as more capable power system assets than conventional air-insulated switchgears (AIS), especially in terms of operational reliability and maintenance requirements. However, insufficient consideration is often given to comparing GIS and AIS substation project options. Therefore, a more effective approach is needed to better inform project investment decisions. This paper outlines the development of a project life-cycle cost-estimating software tool for GIS and equivalent AIS substation projects, and formulation of the underpinning economic models. The cost-estimating tool provides practical and objective comparisons between considered GIS and AIS substation projects, and opportunities to investigate major cost contributing factors in substation project cost estimates.
Keywords
"Substations","Gas insulation","Biological system modeling","Maintenance engineering","Economics","Switches","Software tools"
Publisher
ieee
Conference_Titel
Power & Energy Society General Meeting, 2015 IEEE
ISSN
1932-5517
Type
conf
DOI
10.1109/PESGM.2015.7285852
Filename
7285852
Link To Document