• DocumentCode
    3665838
  • Title

    Prepare to meet the challenges in regional transmission planning and development

  • Author

    Y. Zhu;D. Brown

  • Author_Institution
    Siemens PTI, Minnetonka, MN, 55305, USA
  • fYear
    2015
  • fDate
    7/1/2015 12:00:00 AM
  • Firstpage
    1
  • Lastpage
    5
  • Abstract
    FERC Order No. 1000 requires regional transmission planning to consider and evaluate transmission alternatives and produce more efficient and cost effective regional transmission plans. The Order also removes any federal right of first refusal (ROFR) for new transmission facilities selected for regional cost allocation. This Order will greatly increase competition in transmission planning and development to address significant new transmission investment needs at higher value and lower cost. In this paper, we first review the FERC Order 1000 background and transmission competitive processes in different regions. Then, two real-world examples of developing regional transmission plans are presented. The first example is the development of an optimal and competitive transmission plan for the delivery of large amount of wind energy from a remote region to load centers. The second example is the development of integrated regional transmission projects to meet a needed increase of transfer capability for export of hydro power and wind energy, and also enhance system reliability. Important transmission planning aspects of developing and selecting regional plans are described in detail, including: (1) identifying projects, (2) screening projects, (3) planning in a weak grid, (4) reliability analysis, (5) economical benefit analysis, and (6) final selection of projects.
  • Keywords
    "Planning","Wind farms","Reliability","Economics","Voltage control","HVDC transmission","Reactive power"
  • Publisher
    ieee
  • Conference_Titel
    Power & Energy Society General Meeting, 2015 IEEE
  • ISSN
    1932-5517
  • Type

    conf

  • DOI
    10.1109/PESGM.2015.7286306
  • Filename