• DocumentCode
    3665955
  • Title

    Synchronization of communication service configuration parameter in power utility automation based on IEC 61850 service tacking

  • Author

    Juan Chen; Bin Duan; Yan Liu

  • Author_Institution
    College of Information Engineering, Xiangtan University, China
  • fYear
    2015
  • fDate
    7/1/2015 12:00:00 AM
  • Firstpage
    1
  • Lastpage
    5
  • Abstract
    The configuration mechanism of IEC 61850 communication services brings convenience to information exchange and may also present the problem if configuration information of Intelligent Electronic Devices (IEDs) which belongs to different substations is separately updated. As a possible solution to this problem, the surveillance and synchronization system is presented based on control block services tracking in this paper. A parameter synchronization technology is implemented to generate the tracking report message and to update the configuration information. The proposed approach is tested using OPNET simulation, and the results show that addition of configuration information tracking messages has no effect on normal communication in substation.
  • Keywords
    "Substations","Switches","Surveillance","Databases","Synchronization","Process control"
  • Publisher
    ieee
  • Conference_Titel
    Power & Energy Society General Meeting, 2015 IEEE
  • ISSN
    1932-5517
  • Type

    conf

  • DOI
    10.1109/PESGM.2015.7286429
  • Filename
    7286429