• DocumentCode
    3695996
  • Title

    Solving Job Shop Scheduling Problems by P System with Active Membranes

  • Author

    Laisheng Xiang;Jie Xue

  • Author_Institution
    Sch. of Manage. Sci. &
  • Volume
    1
  • fYear
    2015
  • Firstpage
    242
  • Lastpage
    245
  • Abstract
    This paper focuses on the joint study of membrane computing with job shop scheduling problem. We use membrane to conduct the whole process of computation, which can obtain all possible combinations of operations and machines by evolution rules and calculate the whole computing time by communication rules, complete the order of every artifacts, output the final result through communication rules and division rules. A 3*3 JSSP example is used to indicate the feasibility of the provided algorithm.
  • Keywords
    "Biomembranes","Job shop scheduling","Aluminum nitride","III-V semiconductor materials","Optimal scheduling","Parallel processing","Joints"
  • Publisher
    ieee
  • Conference_Titel
    Intelligent Human-Machine Systems and Cybernetics (IHMSC), 2015 7th International Conference on
  • Print_ISBN
    978-1-4799-8645-3
  • Type

    conf

  • DOI
    10.1109/IHMSC.2015.272
  • Filename
    7334695