DocumentCode :
3695996
Title :
Solving Job Shop Scheduling Problems by P System with Active Membranes
Author :
Laisheng Xiang;Jie Xue
Author_Institution :
Sch. of Manage. Sci. &
Volume :
1
fYear :
2015
Firstpage :
242
Lastpage :
245
Abstract :
This paper focuses on the joint study of membrane computing with job shop scheduling problem. We use membrane to conduct the whole process of computation, which can obtain all possible combinations of operations and machines by evolution rules and calculate the whole computing time by communication rules, complete the order of every artifacts, output the final result through communication rules and division rules. A 3*3 JSSP example is used to indicate the feasibility of the provided algorithm.
Keywords :
"Biomembranes","Job shop scheduling","Aluminum nitride","III-V semiconductor materials","Optimal scheduling","Parallel processing","Joints"
Publisher :
ieee
Conference_Titel :
Intelligent Human-Machine Systems and Cybernetics (IHMSC), 2015 7th International Conference on
Print_ISBN :
978-1-4799-8645-3
Type :
conf
DOI :
10.1109/IHMSC.2015.272
Filename :
7334695
Link To Document :
بازگشت