DocumentCode
3695996
Title
Solving Job Shop Scheduling Problems by P System with Active Membranes
Author
Laisheng Xiang;Jie Xue
Author_Institution
Sch. of Manage. Sci. &
Volume
1
fYear
2015
Firstpage
242
Lastpage
245
Abstract
This paper focuses on the joint study of membrane computing with job shop scheduling problem. We use membrane to conduct the whole process of computation, which can obtain all possible combinations of operations and machines by evolution rules and calculate the whole computing time by communication rules, complete the order of every artifacts, output the final result through communication rules and division rules. A 3*3 JSSP example is used to indicate the feasibility of the provided algorithm.
Keywords
"Biomembranes","Job shop scheduling","Aluminum nitride","III-V semiconductor materials","Optimal scheduling","Parallel processing","Joints"
Publisher
ieee
Conference_Titel
Intelligent Human-Machine Systems and Cybernetics (IHMSC), 2015 7th International Conference on
Print_ISBN
978-1-4799-8645-3
Type
conf
DOI
10.1109/IHMSC.2015.272
Filename
7334695
Link To Document