    Transmission network reconfiguration for reliable operation

  • Author

    Mahmoud I. Soliman;M.A. ALGarni;Talal M. Sadgah;Ahmed F. Bendary

  • Author_Institution
    Saudi Electricity Company, Saudi Arabia
  • fYear
    2015
  • Firstpage
    1
  • Lastpage
    5
  • Abstract
    This paper describes the study methodology for network planning based on reconfiguration transmission network to Facilitate operate the network in reliable, secure and efficient way. All operating areas within country grid are interconnected through transmission network which consider as a source feeding sub transmission network. The underlying sub transmission network, being electrically parallel to the overlying transmission loop; has caused operational difficulties [1], especially during certain outages. Reconfiguration the sub transmission network to avoid this parallel configuration between Extra High Volt (EHV) Transmission and HV sub-transmission networks by the method called bulk supply EHV/HV stations (BSPs) groups in this paper, each BSP feed one group of 5 or more HV/MV substations connected. BSPs groups planned to be connected through EHV Transmission network and disconnected in HV sub- transmission network in case of normal operation by normally open HV Transmission Lines (HVTL). This planning method will briefly described with its advantages in following sections.
  • Keywords
    "Planning","Substations","Loading","Integrated circuit reliability","Companies","Power transmission lines"
  • Publisher
    ieee
  • Conference_Titel
    Power Engineering Conference (UPEC), 2015 50th International Universities
  • Type

    conf

  • DOI
    10.1109/UPEC.2015.7339892
  • Filename
    7339892