• DocumentCode
    3711447
  • Title

    Technical evaluation of the 15% of peak load PV interconnection screen

  • Author

    Matthew J. Reno;Robert J. Broderick

  • Author_Institution
    Sandia National Laboratories, Albuquerque, NM, USA
  • fYear
    2015
  • fDate
    6/1/2015 12:00:00 AM
  • Firstpage
    1
  • Lastpage
    6
  • Abstract
    Most utilities use a standard small generator interconnection procedure (SGIP) process that includes a screen for placing potential PV interconnection requests on a fast track that do not require more detailed study. One common screening threshold is the 15% of peak load screen that fast tracks PV below a certain size. This paper performs a technical evaluation of the screen compared to a large number of simulation results for PV on 40 different feeders. Three error metrics are developed to quantify the accuracy of the screen for identifying interconnections that would cause problems or incorrectly sending a large number of allowable systems for more detailed study.
  • Keywords
    "Voltage control","Voltage measurement","Analytical models","Standards","Generators","Simulation"
  • Publisher
    ieee
  • Conference_Titel
    Photovoltaic Specialist Conference (PVSC), 2015 IEEE 42nd
  • Type

    conf

  • DOI
    10.1109/PVSC.2015.7356168
  • Filename
    7356168