DocumentCode
3711447
Title
Technical evaluation of the 15% of peak load PV interconnection screen
Author
Matthew J. Reno;Robert J. Broderick
Author_Institution
Sandia National Laboratories, Albuquerque, NM, USA
fYear
2015
fDate
6/1/2015 12:00:00 AM
Firstpage
1
Lastpage
6
Abstract
Most utilities use a standard small generator interconnection procedure (SGIP) process that includes a screen for placing potential PV interconnection requests on a fast track that do not require more detailed study. One common screening threshold is the 15% of peak load screen that fast tracks PV below a certain size. This paper performs a technical evaluation of the screen compared to a large number of simulation results for PV on 40 different feeders. Three error metrics are developed to quantify the accuracy of the screen for identifying interconnections that would cause problems or incorrectly sending a large number of allowable systems for more detailed study.
Keywords
"Voltage control","Voltage measurement","Analytical models","Standards","Generators","Simulation"
Publisher
ieee
Conference_Titel
Photovoltaic Specialist Conference (PVSC), 2015 IEEE 42nd
Type
conf
DOI
10.1109/PVSC.2015.7356168
Filename
7356168
Link To Document