DocumentCode :
3720415
Title :
Implementation of robust current zero anticipator for parallel current injection synthetic testing
Author :
Kyoung-Jun Lee;Yun-Seong Kim;Jung-Hyeon Ryu;Seung-Jae Park;Hyeong-Kee Rhyou
Author_Institution :
High Power Testing Department I, Korea Electrotechnology Research Institute, Changwon, Korea
fYear :
2015
Firstpage :
601
Lastpage :
603
Abstract :
Development in electrical power transmission system requires the use of circuit breakers with increasing breaking capacity. To meet the test requirements of larger capacity of high voltage capacity, the parallel current injection synthetic testing is the most widely used method instead of direct testing, based on IEC 62271-100 and IEC 62271-101. During synthetic testing, the making switch is used to supply short circuit current and the gap-switch is triggered at the desired moment before the current zero. To control the trigger timing of gap-switch, a current zero anticipator (CZA) is essential in high power testing laboratory. This paper presents an algorithm and hardware implementation of current zero anticipator that is robust to surge current or noise in parallel current injection synthetic testing.
Keywords :
"Testing","Circuit breakers","IEC Standards","Robustness","Switching circuits","Short-circuit currents","Timing"
Publisher :
ieee
Conference_Titel :
Electric Power Equipment ? Switching Technology (ICEPE-ST), 2015 3rd International Conference on
Type :
conf
DOI :
10.1109/ICEPE-ST.2015.7368430
Filename :
7368430
Link To Document :
بازگشت