DocumentCode :
3721523
Title :
Study on duration calculate model of railway construction based on LSM
Author :
Liqiang Liu; Yisheng Liu; Yuanjie Tang
Author_Institution :
Beijing Jiaotong University, Beijing, china
fYear :
2015
fDate :
7/1/2015 12:00:00 AM
Firstpage :
1
Lastpage :
5
Abstract :
Reasonable duration is very important in terms of construction. This study presents a new model for calculate the railway construction project duration by means of linear Scheduling method. It gives two kinds of activity combination, the two respectively the calculation method of combination of the construction duration. And the duration of the validity of the proposed method are determined verified by an actual railway project instance.
Keywords :
"Rail transportation","Schedules","Time factors","Strips","Railway engineering","Information rates"
Publisher :
ieee
Conference_Titel :
Logistics, Informatics and Service Sciences (LISS), 2015 International Conference on
Type :
conf
DOI :
10.1109/LISS.2015.7369805
Filename :
7369805
Link To Document :
بازگشت