• DocumentCode
    3722391
  • Title

    Multi-workflow QoS-Constrained Scheduling for Utility Computing

  • Author

    Hamid Arabnejad;Jorge G. Barbosa

  • Author_Institution
    Dept. de Eng. Inf., Univ. do Porto, Porto, Portugal
  • fYear
    2015
  • Firstpage
    137
  • Lastpage
    144
  • Abstract
    In this paper, we introduce a utility driven strategy to schedule concurrent workflows constrained to user´s QoS parameters, namely Deadline and Budget. The Multi-Workflow Deadline-Budget Scheduling algorithm (MW-DBS) can schedule multiple workflows that can arrive to the system at any instant of time, with the aim of satisfying individual QoS requirements. Common approaches optimize one factor, e.g. processing time, constrained to the other factor, e.g. cost. MW-DBS produces schedules without optimizing any of the parameters but guaranteeing that the deadline and budget defined for each workflow are not exceeded. We study the scalability of the algorithm with different types of workflows and service providers. Experimental results show that our strategy is able to increase the scheduling success rate of finding valid solutions.
  • Keywords
    "Scheduling","Program processors","Quality of service","Schedules","Heuristic algorithms","Scheduling algorithms"
  • Publisher
    ieee
  • Conference_Titel
    Computational Science and Engineering (CSE), 2015 IEEE 18th International Conference on
  • Type

    conf

  • DOI
    10.1109/CSE.2015.29
  • Filename
    7371366