DocumentCode :
3727235
Title :
Business process optimization from single timestamp event log
Author :
Riyanarto Sarno;Fitrianing Haryadita; Kartini; Sarwosri;Adhatus Solichah A
Author_Institution :
Informatics Department, Faculty of Information Technology, Institut Teknologi Sepuluh Nopember, Indonesia
fYear :
2015
Firstpage :
50
Lastpage :
55
Abstract :
Time-cost optimization (TCO) may be defined as a process to identify suitable construction activities to get the minimum duration of process and minimum additional cost which is needed. CPM crashing project is one of method to sole the time-cost optimization. But CPM crashing project need some data to speeding up the process business whereas in reality there are a lot of data which is represent using single timestamp event log which does not provide. There for this paper represents a method to get data which is use to crashing project. The data is got from averaging time execution of each activity in case in event log. Then to crashing the project this paper use linear programming to get minimum duration and minimum additional cost.
Keywords :
"Computer crashes","Business","Mathematical model","Optimization","Unified modeling language","Linear programming","Production"
Publisher :
ieee
Conference_Titel :
Computer, Control, Informatics and its Applications (IC3INA), 2015 International Conference on
Type :
conf
DOI :
10.1109/IC3INA.2015.7377745
Filename :
7377745
Link To Document :
بازگشت