DocumentCode :
3728862
Title :
Realistic manufacturing scheduling - 2
Author :
Eva Vallada;Rub?n Ruiz
fYear :
2015
Firstpage :
117
Lastpage :
117
Abstract :
The gap between scheduling theory and practice has been long known, recognized and studied. More often than not, elaborated scheduling models and procedures are proven to be extremely effective in controlled and synthetic laboratory problems but rarely applied in practical manufacturing scheduling. Real scheduling problems are varied, big and rich in the number of constraints and special characteristics.
Keywords :
"Job shop scheduling","Manufacturing","Schedules","Companies","Optimization","Heuristic algorithms"
Publisher :
ieee
Conference_Titel :
Industrial Engineering and Systems Management (IESM), 2015 International Conference on
Type :
conf
DOI :
10.1109/IESM.2015.7380145
Filename :
7380145
Link To Document :
بازگشت