DocumentCode :
3729829
Title :
Description of the new RAS to be installed in the power system of Uruguay
Author :
D. S. Beledo;D. Bonjour;F. Sanchez;N. Yedrzejewski
Author_Institution :
UTE - Uruguay
fYear :
2015
Firstpage :
188
Lastpage :
193
Abstract :
This paper describes the mechanism by which the new Remedial Action Scheme (RAS) to be installed in Uruguay determines corrective actions for major single and multiple contingencies in the 500kV system. The general mechanism is divided into 8 logics that calculate automatically without operator intervention necessary load shedding to balance demand with generation or eliminate overloads. Also determines the disconnection of stations to achieve the load shedding, lines to separate systems or isolate small zones and shunt capacitive compensation for voltage control. The system also calculates the required change in the power exchange in the HVDC link between Uruguay and Brazil.
Keywords :
"Load flow","Voltage control","HVDC transmission","Frequency control","Power markets","Integrated circuits","Reactive power"
Publisher :
ieee
Conference_Titel :
Innovative Smart Grid Technologies Latin America (ISGT LATAM), 2015 IEEE PES
Type :
conf
DOI :
10.1109/ISGT-LA.2015.7381151
Filename :
7381151
Link To Document :
بازگشت