• DocumentCode
    3729829
  • Title

    Description of the new RAS to be installed in the power system of Uruguay

  • Author

    D. S. Beledo;D. Bonjour;F. Sanchez;N. Yedrzejewski

  • Author_Institution
    UTE - Uruguay
  • fYear
    2015
  • Firstpage
    188
  • Lastpage
    193
  • Abstract
    This paper describes the mechanism by which the new Remedial Action Scheme (RAS) to be installed in Uruguay determines corrective actions for major single and multiple contingencies in the 500kV system. The general mechanism is divided into 8 logics that calculate automatically without operator intervention necessary load shedding to balance demand with generation or eliminate overloads. Also determines the disconnection of stations to achieve the load shedding, lines to separate systems or isolate small zones and shunt capacitive compensation for voltage control. The system also calculates the required change in the power exchange in the HVDC link between Uruguay and Brazil.
  • Keywords
    "Load flow","Voltage control","HVDC transmission","Frequency control","Power markets","Integrated circuits","Reactive power"
  • Publisher
    ieee
  • Conference_Titel
    Innovative Smart Grid Technologies Latin America (ISGT LATAM), 2015 IEEE PES
  • Type

    conf

  • DOI
    10.1109/ISGT-LA.2015.7381151
  • Filename
    7381151