DocumentCode :
3729830
Title :
Description of the simulator developed for the new RAS to be installed in the power system of Uruguay
Author :
S. Beledo;N. Yedrzejewski
Author_Institution :
UTE Uruguay
fYear :
2015
Firstpage :
194
Lastpage :
197
Abstract :
In electric power systems there are contingencies that can cause overload of any equipment, angular and voltage stability problems and frequency stability issues due to imbalances between load and generation. Most of those contingencies require disconnecting load to ensure the stability of the system and the integrity of the equipment. In most cases disconnection should be performed so quickly that it is possible only automatically. Such solutions are commonly referred by the acronym RAS, which means “Remedial Action Scheme”. UTE is currently implementing a solution of RAS [1] type to protect the network against the most severe contingencies.
Keywords :
"Servers","Graphics","Limiting","Capacitors","Biographies"
Publisher :
ieee
Conference_Titel :
Innovative Smart Grid Technologies Latin America (ISGT LATAM), 2015 IEEE PES
Type :
conf
DOI :
10.1109/ISGT-LA.2015.7381152
Filename :
7381152
Link To Document :
بازگشت