DocumentCode
3732940
Title
Dynamic job sequencing in two parallel two-machine flow shop
Author
Mojahid F. Saeed Osman
Author_Institution
Department of Industrial Engineering, American University of Sharjah, United Arab Emirates
fYear
2015
Firstpage
485
Lastpage
488
Abstract
In this paper, the case where there are two parallel two-machine flow-shops available to process jobs is considered. We developed a method that creates sequences intended to dynamically minimize the makespan while jobs are added overtime. The solution procedure developed in this research is demonstrated using an illustrative example. The results revealed the effectiveness of the proposed approach for solving dynamic sequencing problem with two parallel two-machine flow-shops.
Keywords
"Sequential analysis","Job shop scheduling","Operations research","Schedules","Europe","Benchmark testing","Computers"
Publisher
ieee
Conference_Titel
Industrial Engineering and Engineering Management (IEEM), 2015 IEEE International Conference on
Type
conf
DOI
10.1109/IEEM.2015.7385694
Filename
7385694
Link To Document