DocumentCode
3733127
Title
Gap analysis of required and available capacity
Author
Ryanto Hartono; Laurence
Author_Institution
Department of Industrial Engineering, University of Pelita Harapan, Indonesia
fYear
2015
Firstpage
1432
Lastpage
1436
Abstract
One of the common problems in running production facility is capacity versus demand. Well production planning will provide considerable advantages for companies, for instance: the company will be able to minimize losses due to over investment cost on the machine which amounts exceed the needs and inability of the company to meet market demand. The planning production capacity of a manufacturing company itself, there are several alternative, for example, the addition of shift work and the use of overtime. The starting point of the research is based on the failure to meet demand of the underwear manufacture. This research focus on the calculation of available capacity based on standard time, required capacity using forecasting method, the error and the impact of deviation in the future.
Keywords
"Forecasting","Smoothing methods","Coatings","Heating","Linear regression","Packaging","Companies"
Publisher
ieee
Conference_Titel
Industrial Engineering and Engineering Management (IEEM), 2015 IEEE International Conference on
Type
conf
DOI
10.1109/IEEM.2015.7385884
Filename
7385884
Link To Document