DocumentCode
3733156
Title
Performance Based Contracting for the manufacturing industry by using integrated platform and dynamic pricing model
Author
Lindawati;Aldy Gunawan
Author_Institution
SAP Innovation Center Singapore, Singapore
fYear
2015
Firstpage
1578
Lastpage
1582
Abstract
Although Performance Based Contracting (PBC) concept is not totally new, the PBC adaptation in Industrial Machinery and Components (IMC) manufacturing, which produces high-value and long life machineries, is rather slow and it is done with extra caution. Three main concerns for manufacturers to implement PBC are the investment cost, the maintenance cost and possible revenue loss. To handle these concerns and accelerate the PBC implementation, we propose an integrated platform that consists of three components: dynamic pricing, sensor data feeding and machinery monitoring. We model the dynamic pricing as an optimization problem and propose Genetic Algorithm to solve the problem. We run the experiment on generated data and show that GA provides a good pricing solution with average difference of 5.64% from the traditional fixed leasing price.
Keywords
"Machinery","Pricing","Genetic algorithms","Contracts","Biological cells","Vehicle dynamics","Monitoring"
Publisher
ieee
Conference_Titel
Industrial Engineering and Engineering Management (IEEM), 2015 IEEE International Conference on
Type
conf
DOI
10.1109/IEEM.2015.7385913
Filename
7385913
Link To Document