DocumentCode
3738819
Title
Determination of regional transmission connection capacities in a deregulated environment
Author
Ali Haydar Güverçinci;Sinan Eren;Yusuf Yanık;Özgür Tanıdır
Author_Institution
Electrical Power Technologies Group, T?B?TAK MAM Energy Institute, Ankara, Turkey
fYear
2015
Firstpage
555
Lastpage
558
Abstract
This paper discusses determination of transmission connection capacities based on distribution regions. In a deregulated environment in which generation and distribution parts of power system are deregulated, planning of transmission system investments is a cumbersome task. In addition, transmission system operators (TSO) have no direct control over plant investments. Instead, several mechanisms introduced to the electricity market considering the economical and reliable transmission expansion planning. In Turkish electricity market case, TSO is obliged to calculate regional allowable generation capacity for the next five and ten year period in order to encourage power plant investments to proper locations and to prevent possible inadequacy of transmission system in the future. In this study, regions are utilized according to distribution companies´ geographic borders. The main purpose for capacity assessment work is the determination of available capacity for the connection of new generation to the transmission system. Besides, it indicates the weak points of transmission system that should be strengthened. The proposed method is applied to Turkish Transmission System for 2020 and 2025 summer peak loading condition scenarios.
Keywords
"Investment","Loading","Planning","Power generation","Companies","Substations","Security"
Publisher
ieee
Conference_Titel
Electrical and Electronics Engineering (ELECO), 2015 9th International Conference on
Type
conf
DOI
10.1109/ELECO.2015.7394645
Filename
7394645