• DocumentCode
    3746730
  • Title

    Improving business project performance by increasing the effectiveness of resource capacity and allocation policies

  • Author

    Peter H. Tag

  • Author_Institution
    Department of Industrial and Systems Engineering, Imagine That Inc., 6830 Via Del Oro, Suite 230, San Jose, CA 95119, USA
  • fYear
    2015
  • Firstpage
    856
  • Lastpage
    867
  • Abstract
    Resource capacity plans and allocation policies have a significant impact on the performance of business projects. This is particularly true in situations where multiple projects compete concurrently for scarce resources. Project management tools have limited ability to analyze the impact of resource allocation policies in systems with variability. Simulation tools are designed for this type of analysis. This paper focuses on simulation analyses of the relation between changes to resource capacity, resource allocation policies, variability, and project performance. Scenarios are simulated for different combinations of changes to resource quantities, work schedule durations, allocation policies, and task duration variability. Each scenario´s performance is measured based on total project cycle-times and costs. The results demonstrate how increasing the flexibility of resource allocation policies can increase the effectiveness of resource capacity and significantly reduce project cycle-times without increasing project costs.
  • Publisher
    ieee
  • Conference_Titel
    Winter Simulation Conference (WSC), 2015
  • Electronic_ISBN
    1558-4305
  • Type

    conf

  • DOI
    10.1109/WSC.2015.7408222
  • Filename
    7408222