DocumentCode
3746730
Title
Improving business project performance by increasing the effectiveness of resource capacity and allocation policies
Author
Peter H. Tag
Author_Institution
Department of Industrial and Systems Engineering, Imagine That Inc., 6830 Via Del Oro, Suite 230, San Jose, CA 95119, USA
fYear
2015
Firstpage
856
Lastpage
867
Abstract
Resource capacity plans and allocation policies have a significant impact on the performance of business projects. This is particularly true in situations where multiple projects compete concurrently for scarce resources. Project management tools have limited ability to analyze the impact of resource allocation policies in systems with variability. Simulation tools are designed for this type of analysis. This paper focuses on simulation analyses of the relation between changes to resource capacity, resource allocation policies, variability, and project performance. Scenarios are simulated for different combinations of changes to resource quantities, work schedule durations, allocation policies, and task duration variability. Each scenario´s performance is measured based on total project cycle-times and costs. The results demonstrate how increasing the flexibility of resource allocation policies can increase the effectiveness of resource capacity and significantly reduce project cycle-times without increasing project costs.
Publisher
ieee
Conference_Titel
Winter Simulation Conference (WSC), 2015
Electronic_ISBN
1558-4305
Type
conf
DOI
10.1109/WSC.2015.7408222
Filename
7408222
Link To Document