• DocumentCode
    374886
  • Title

    Daily generation schedule under open partial unbundling generation market

  • Author

    Youjiang, Sun ; Gengyin, Li ; Ming, Zhou ; Pan Yunjinag

  • Author_Institution
    Dept. of Electr. Eng., North China Electr. Power Univ., Hebei, China
  • Volume
    1
  • fYear
    2000
  • fDate
    30 Oct.-1 Nov. 2000
  • Firstpage
    76
  • Abstract
    According to the present pre-commercial operation stage of the Chinese electricity market situated unbundling generation market, the paper proposes the design rule of scheduling daily generation under an open partial unbundling generation market (DSGUP), and introduces functions and characteristics of main functional modules of DSGUP, and an operating flowchart. The field test in a certain provincial electrical grid shows that the DSGUP has the characteristics of small calculation amount, speediness and strong practicability.
  • Keywords
    electricity supply industry; power generation planning; power generation scheduling; China; daily generation schedule; design rule; electricity market; open partial unbundling generation market; operating flowchart;
  • fLanguage
    English
  • Publisher
    iet
  • Conference_Titel
    Advances in Power System Control, Operation and Management, 2000. APSCOM-00. 2000 International Conference on
  • Print_ISBN
    0-85296-791-8
  • Type

    conf

  • DOI
    10.1049/cp:20000367
  • Filename
    950271