DocumentCode
3760521
Title
Comparison study on restoration strategies of chongqing power grid
Author
Tao Chen;Li Feng;Xinyu Liu;Lin Zhang;Lingyun Tao;Ying Wang;Pei Zhang
Author_Institution
Network dispatching center, Chongqing Electric Power Corporation, Chongqing, China
fYear
2015
Firstpage
2425
Lastpage
2430
Abstract
The efficient restoration after large-scale electric interruption is an important subject for ensuring the secure operation of power systems. This paper applies the concept of "generic restoration milestones (GRMs)" to develop two different restoration strategies of Chongqing power system. One adopts build-outward approach that utilizes internal hydropower as black-start units. Another adopts build-inward approach that utilizes external power source as black-start units. Comparison study results show that the build-inward strategy uses less time than the build-outward strategy, thereby promotes the process of restoration. It can assist system operators in selecting an optimal restoration plan.
Keywords
"Decision support systems","Power industry","Interrupters","Hydroelectric power generation","Power grids"
Publisher
ieee
Conference_Titel
Electric Utility Deregulation and Restructuring and Power Technologies (DRPT), 2015 5th International Conference on
Type
conf
DOI
10.1109/DRPT.2015.7432653
Filename
7432653
Link To Document