• DocumentCode
    3760521
  • Title

    Comparison study on restoration strategies of chongqing power grid

  • Author

    Tao Chen;Li Feng;Xinyu Liu;Lin Zhang;Lingyun Tao;Ying Wang;Pei Zhang

  • Author_Institution
    Network dispatching center, Chongqing Electric Power Corporation, Chongqing, China
  • fYear
    2015
  • Firstpage
    2425
  • Lastpage
    2430
  • Abstract
    The efficient restoration after large-scale electric interruption is an important subject for ensuring the secure operation of power systems. This paper applies the concept of "generic restoration milestones (GRMs)" to develop two different restoration strategies of Chongqing power system. One adopts build-outward approach that utilizes internal hydropower as black-start units. Another adopts build-inward approach that utilizes external power source as black-start units. Comparison study results show that the build-inward strategy uses less time than the build-outward strategy, thereby promotes the process of restoration. It can assist system operators in selecting an optimal restoration plan.
  • Keywords
    "Decision support systems","Power industry","Interrupters","Hydroelectric power generation","Power grids"
  • Publisher
    ieee
  • Conference_Titel
    Electric Utility Deregulation and Restructuring and Power Technologies (DRPT), 2015 5th International Conference on
  • Type

    conf

  • DOI
    10.1109/DRPT.2015.7432653
  • Filename
    7432653