Abstract :
Less than 1% of some 300,000 miles of transmission lines are underground. To put all transmission lines underground would cost 5 to 10 billion dollars. Current cost and installation methods used in U.S.A. have been fully and expertly reported.1 The immediate need is for undergrounding new transmission lines in and around cities at a total cost equal to or less than overhead.