• DocumentCode
    3771930
  • Title

    Early-Release Boundary Fair Scheduler with Task-interrupt Co-scheduling

  • Author

    Tong Changsheng;Liu Yani;Zhang Fengdeng;Chang Guopeng

  • Author_Institution
    Univ. of Shanghai for Sci. &
  • fYear
    2015
  • Firstpage
    357
  • Lastpage
    360
  • Abstract
    With the advent of multi-core platforms in embedded devices, there is a reviving interest in scheduling algorithms for multiprocessor real-time systems. Boundary fair (Bfair) is a optimal scheduling algorithm that can fully utilize all cores as the well-known Pfair scheduling algorithms. We proposed the early-release Bfair (ERBF) scheduler, which is a variant of Bfair scheduler, the difference is that ERBF is work conserving. To support the robustness to interactions with the physical environment, a novel task-interrupt coscheduling approach is added to ERBF scheduler. The evaluation results show that the extended ERBF scheduler performs better than original scheduler, making it more suitable for embedded real-time systems control tasks.
  • Keywords
    "Schedules","Optimal scheduling","Scheduling","Program processors","Real-time systems","Control systems","Processor scheduling"
  • Publisher
    ieee
  • Conference_Titel
    Intelligent Systems Design and Engineering Applications (ISDEA), 2015 Sixth International Conference on
  • Type

    conf

  • DOI
    10.1109/ISDEA.2015.95
  • Filename
    7462633