DocumentCode
377250
Title
Parallel klystron operation at the Advanced Photon Source storage ring
Author
Horan, Doug ; Cherbak, Ernest
Author_Institution
Adv. Photon Source, Argonne Nat. Lab., IL, USA
Volume
2
fYear
2001
fDate
2001
Firstpage
990
Abstract
A parallel-klystron topology has been designed and tested at the Advanced Photon Source to supply rf power to the 7-GeV storage ring rf cavities. The rf power output of two 1.1-MW, 352-MHz rf stations is combined utilizing a 3-dB/90-degree hybrid. The two outputs of the hybrid then supply rf power to two sectors of storage-ring cavities. Feedback control loops maintain the proper output phase and amplitude from each rf station at the combining hybrid input ports so that the correct power balance and phase relationship is maintained between the two sectors of storage ring cavities. Downstream mechanical phase shifters correct for phase changes when only one of the two rf stations is used in single-ended mode. EPICS is utilized to monitor and control the parallel-klystron system
Keywords
accelerator RF systems; accelerator control systems; electron accelerators; feedback; klystrons; storage rings; 1.1 MW; 352 MHz; 7 GeV; APS; Advanced Photon Source; EPICS; RF cavities; RF power; amplitude; feedback control loops; mechanical phase shifters; output phase; parallel-klystron topology; storage ring; Control systems; Directional couplers; Klystrons; Laboratories; Phase shifters; Power supplies; RF signals; Radio frequency; Storage rings; Topology;
fLanguage
English
Publisher
ieee
Conference_Titel
Particle Accelerator Conference, 2001. PAC 2001. Proceedings of the 2001
Conference_Location
Chicago, IL
Print_ISBN
0-7803-7191-7
Type
conf
DOI
10.1109/PAC.2001.986551
Filename
986551
Link To Document