• DocumentCode
    377250
  • Title

    Parallel klystron operation at the Advanced Photon Source storage ring

  • Author

    Horan, Doug ; Cherbak, Ernest

  • Author_Institution
    Adv. Photon Source, Argonne Nat. Lab., IL, USA
  • Volume
    2
  • fYear
    2001
  • fDate
    2001
  • Firstpage
    990
  • Abstract
    A parallel-klystron topology has been designed and tested at the Advanced Photon Source to supply rf power to the 7-GeV storage ring rf cavities. The rf power output of two 1.1-MW, 352-MHz rf stations is combined utilizing a 3-dB/90-degree hybrid. The two outputs of the hybrid then supply rf power to two sectors of storage-ring cavities. Feedback control loops maintain the proper output phase and amplitude from each rf station at the combining hybrid input ports so that the correct power balance and phase relationship is maintained between the two sectors of storage ring cavities. Downstream mechanical phase shifters correct for phase changes when only one of the two rf stations is used in single-ended mode. EPICS is utilized to monitor and control the parallel-klystron system
  • Keywords
    accelerator RF systems; accelerator control systems; electron accelerators; feedback; klystrons; storage rings; 1.1 MW; 352 MHz; 7 GeV; APS; Advanced Photon Source; EPICS; RF cavities; RF power; amplitude; feedback control loops; mechanical phase shifters; output phase; parallel-klystron topology; storage ring; Control systems; Directional couplers; Klystrons; Laboratories; Phase shifters; Power supplies; RF signals; Radio frequency; Storage rings; Topology;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    Particle Accelerator Conference, 2001. PAC 2001. Proceedings of the 2001
  • Conference_Location
    Chicago, IL
  • Print_ISBN
    0-7803-7191-7
  • Type

    conf

  • DOI
    10.1109/PAC.2001.986551
  • Filename
    986551