• DocumentCode
    377272
  • Title

    Superconducting RF system upgrade for short bunch operation of CESR

  • Author

    Belomestnykh, S. ; Barnes, P. ; Ehrlich, R. ; Geng, R. ; Hartill, D. ; Henderson, S. ; Kaplan, R. ; Knobloch, J. ; Padamsee, H. ; Peck, S. ; Quigley, P. ; Reilly, J. ; Rubin, D. ; Sabol, D. ; Sears, J. ; Tigner, M. ; Veshcherevich, V.

  • Author_Institution
    Lab. of Nucl. Studies, Cornell Univ., Ithaca, NY, USA
  • Volume
    2
  • fYear
    2001
  • fDate
    2001
  • Firstpage
    1062
  • Abstract
    The CESR luminosity upgrade plan calls for shortening bunch length to 1 cm. Such bunch length can be achieved by installing two more superconducting cavities to increase total RF voltage. The RF system upgrade necessary to accommodate this change is discussed
  • Keywords
    accelerator RF systems; accelerator cavities; colliding beam accelerators; electron accelerators; particle beam bunching; storage rings; superconducting cavity resonators; CESR luminosity upgrade plan; RF system upgrade; bunch length; short bunch operation; superconducting RF system upgrade; superconducting cavities; Acceleration; Klystrons; Laboratories; Power demand; Radio frequency; Resonance; Temperature; Testing; Transmitters; Voltage;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    Particle Accelerator Conference, 2001. PAC 2001. Proceedings of the 2001
  • Conference_Location
    Chicago, IL
  • Print_ISBN
    0-7803-7191-7
  • Type

    conf

  • DOI
    10.1109/PAC.2001.986578
  • Filename
    986578