DocumentCode :
377292
Title :
Testing procedures and results of the prototype fundamental power coupler for the Spallation Neutron Source
Author :
Stirbet, M. ; Campisi, I.E. ; Daly, E.F. ; Davis, G.K. ; Drury, M. ; Kneisel, P. ; Myneni, G. ; Powers, T. ; Schneider, W.J. ; Wilson, K.M. ; Yang, Yi ; Cummings, K.A. ; Hardek, T.
Author_Institution :
TJNAF, Newport News, VA, USA
Volume :
2
fYear :
2001
fDate :
2001
Firstpage :
1125
Abstract :
High-power RF testing with peak power in excess of 500 kW has been performed on prototype fundamental power couplers (FPC) for the Spallation Neutron Source superconducting (SNS) cavities. The testing followed the development of procedures for cleaning, assembling and preparing the FPC for installation in the test stand. The qualification of the couplers has occurred for the time being only in a limited set of conditions (travelling wave, 20 pps) as the available RF system and control instrumentation are under improvement
Keywords :
accelerator RF systems; accelerator cavities; leak detection; neutron sources; superconducting cavity resonators; transformer testing; vacuum apparatus; waveguide couplers; 500 kW; RF testing; SNS; Spallation Neutron Source; assembling; cleaning; fundamental power couplers; leak test; superconducting cavities; travelling wave; vacuum test; Assembly; Cleaning; Couplers; Flexible printed circuits; Neutrons; Performance evaluation; Prototypes; Radio frequency; Superconducting devices; Testing;
fLanguage :
English
Publisher :
ieee
Conference_Titel :
Particle Accelerator Conference, 2001. PAC 2001. Proceedings of the 2001
Conference_Location :
Chicago, IL
Print_ISBN :
0-7803-7191-7
Type :
conf
DOI :
10.1109/PAC.2001.986601
Filename :
986601
Link To Document :
بازگشت