DocumentCode
3773583
Title
Optimizing NPV of Projects under Cash Constraint by Modified ACO Algorithm
Author
Jingyu Luo;Shengyang Zhong;Chunguang Chang
Author_Institution
Inf. &
Volume
2
fYear
2015
Firstpage
75
Lastpage
78
Abstract
Considering the condition that cash and time are constrained, and the general background of growing financing cost, aiming at maximizing the net present value (NPV), an optimizing model for this kind of problem is established. Ant colony optimization is modified to solve above problem, an elitist strategy is introduced to accelerate convergence. A specific example of this problem is utilized to validate above model and its algorithm. It indicates from the result that the model can provide a dispatch strategy of the project, the algorithm provide a satisfactory solution for the problem. The convergence of the algorithm is relatively good and it can be used to solve practical problems.
Keywords
"Schedules","Finishing","Job shop scheduling","Ant colony optimization","Finance","Convergence","Optimization"
Publisher
ieee
Conference_Titel
Computational Intelligence and Design (ISCID), 2015 8th International Symposium on
Print_ISBN
978-1-4673-9586-1
Type
conf
DOI
10.1109/ISCID.2015.183
Filename
7469084
Link To Document