• DocumentCode
    3773583
  • Title

    Optimizing NPV of Projects under Cash Constraint by Modified ACO Algorithm

  • Author

    Jingyu Luo;Shengyang Zhong;Chunguang Chang

  • Author_Institution
    Inf. &
  • Volume
    2
  • fYear
    2015
  • Firstpage
    75
  • Lastpage
    78
  • Abstract
    Considering the condition that cash and time are constrained, and the general background of growing financing cost, aiming at maximizing the net present value (NPV), an optimizing model for this kind of problem is established. Ant colony optimization is modified to solve above problem, an elitist strategy is introduced to accelerate convergence. A specific example of this problem is utilized to validate above model and its algorithm. It indicates from the result that the model can provide a dispatch strategy of the project, the algorithm provide a satisfactory solution for the problem. The convergence of the algorithm is relatively good and it can be used to solve practical problems.
  • Keywords
    "Schedules","Finishing","Job shop scheduling","Ant colony optimization","Finance","Convergence","Optimization"
  • Publisher
    ieee
  • Conference_Titel
    Computational Intelligence and Design (ISCID), 2015 8th International Symposium on
  • Print_ISBN
    978-1-4673-9586-1
  • Type

    conf

  • DOI
    10.1109/ISCID.2015.183
  • Filename
    7469084