• DocumentCode
    377540
  • Title

    Phase rotation at the front end of a neutrino factory

  • Author

    Kirk, Harold ; Gallardo, Juan ; Palmer, Robert ; Green, Michael ; Reginato, Lou ; Yu, Simon ; Kaplan, Dan ; Fukui, Yasuo

  • Author_Institution
    Brookhaven Nat. Lab., Upton, NY, USA
  • Volume
    3
  • fYear
    2001
  • fDate
    2001
  • Firstpage
    2026
  • Abstract
    The muon collection scheme for a muon-storage-ring-based neutrino factory consists of a target irradiated with a 1 MW proton beam followed by a 30-m decay channel and then a 300-m long induction linac phase rotation. The purpose of the induction-linac section is to reduce the δE/E spread of the collected muons to a value which is manageable for the subsequent buncher and cooling sections. We describe in this paper the overall design concept of the phase-rotation system and give key parameters for the induction linacs
  • Keywords
    beam handling equipment; linear accelerators; storage rings; 1 MW; 30 m; 300 m; induction linac; muon collection scheme; muon storage ring; neutrino factory; phase rotation; Acceleration; Cooling; Energy management; Kirk field collapse effect; Linear particle accelerator; Mesons; Neutrino sources; Particle beams; Production facilities; Throughput;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    Particle Accelerator Conference, 2001. PAC 2001. Proceedings of the 2001
  • Conference_Location
    Chicago, IL
  • Print_ISBN
    0-7803-7191-7
  • Type

    conf

  • DOI
    10.1109/PAC.2001.987264
  • Filename
    987264